INSTALLATION MANUALAPPLICATION:FA F17 200G (200gph @ 55psi)Ford Powerstroke 6.7L*bypassing the factory Lift Pump*2011-2012
A. Very Important: Before removing the fuel tank identify “ALL” areas of clearance between the tank and bed to install the draw tube assembly. The
NOTE: Hose clamps are not recommended for push lock fittings. They will hold up to 300psi! Use oil on fittings and inside fuel line when installing
L. De-burr hole and check for fit. M. Place the bulk head assembly into the drilled hole, take measurements so the bottom of the suction tube is o
Some of the photo’s are of a different application, procedures are the same. A. Insert PFB-2001C in to bed channel align the nut with the opening
D. Using thread tape, install the 2 10-300 into the “T” & “E” ports. Torque to 40 ft./lbs. Connect the male end of the wire harness to the fem
Do Not use sealant on AN (Male Flare) fittings. Only use sealant on threads installed into pump assembly. A. Route suction line from the suction t
F. Using oil, insert PLB-1212 into one end of FL-1002 fuel line. Oil the PLB and slide into the yellow-clipped factory feed fitting until you hear
The preset pressure is approximately 55 psi. Follow these steps to check or reset the fuel pressure. The port with 1/8” Allen plug marked with the l
Disclaimer: To help insure you receive the proper system and customer support at the local level, FASS has a VIP and Authorized Dealer network rep
Dear Valued Customer, “Made in the USA” is not just a slogan at FASS; it’s what we live by! FASS is not only assembled in the USA but 98%+ of
FASS Recommended Application FA F17 200G Powerstroke (6.7L) 2011 - 2012 with extreme horsepower modifications ¡WARNINGS! Read all instructio
(FA F17 200G) (FA F17 200G) INSTALLATION MANUAL Follow these steps to ensure a simple installation of your new FASS ADJUSTA
200 GPH 55 PSI (Approximately) Adjustable Fuel Pump Series A fuel pressure gauge is highly recommended to identify fuel filter life and to prevent
Contents FL-1002 x9’ WH-1005 BHB-1001 THB-1001 FF-3248 MP-9071 FPB-2005
HC-1001 Ring Terminal BHF-1002 PL-1004 ST-1005Px16” BHN-1001 OR-223 LW-1001 RS-1002 Mounting Package Contents 1/2” Plug 10-300 PLB-1212 PL-1005 Ca
C. Crimp the ring terminals to the red and green wires of the WH-1005 Wire Harness. Attach red wire to the positive terminal of the battery
The installation of the electrical harness is done first, allowing power to be applied to the pump for lubrication purposes. F. Route WH-1005 wire
Kommentare zu diesen Handbüchern